The latest TfL Commissioner’s Report [PDF] has been published, and it contains mixed news for our manor. The bad (depending on your point of view, I suppose) news is that the proposed Bakerloo Line extension through Camberwell is off the table:
We undertook an initial consultation in autumn 2014 on route options for a Bakerloo line extension to the south of Elephant and Castle. Since then we have undertaken further work on a number of alternative routes proposed during the initial consultation. The results of that work demonstrate that the preferred route option for a first phase is from Elephant and Castle to Lewisham via Old Kent Road.
However, there is the promise of compensation for not getting the tube:
Any extension would also be supported by significant improvements to the national rail network in southeast London, including the possibility of a new Thameslink station at Camberwell.
Presumably this would be on the site of the old station, on Station Road — this area has previously been flagged for major development. It’s been mentioned that this would ‘reopen’ the station, but I think it would be a complete rebuild / new build — I can’t see how there’s enough left of the old station (closed to passengers in 1916, to freight in 1964) to be viable.
In other transport news, TfL is consulting on changes to the 436 bus route. It’s proposed that the bus will no longer go on to Paddington after Vauxhall, but will instead go to Battersea (to serve the new developments there). The bus would also reduce in frequency between Lewisham and Vauxhall. To compensate for the reduced service of the 436, the 36 would increase in frequency.
The consultation on this change closes on the 10th of January.
Thanks to London SE1 for the heads-up on the tube story.








